DivyaSree Techno Park is located in the IT hub of Bangalore. DivyaSree Techno Park is an all-inclusive campus development project built over 7 million sq. ft of land. This project spreads over 75 acres of land, and has been allotted the status of an IT Park Development and is part of the EPIP zone recognized by the Govt of Karnataka. Besides the magnificent 9.5 meters tree lined avenue within the Business Park, the park is also supported by common retail facilities like food courts, fitness center’s, business center’s, guest suites and banking facilities. The overall plot coverage is less than 35% with an emphasis on large open spaces offering a work, live and play lifestyle.
Details:
Geographic Description : Bangalore, State of Karnataka, India
Micro Location : EPIP Zone, Whitefield besides GE John F Welch Technology Center, Eastern part of Bangalore.
Location Advantage : Situated in the IT corridor earmarked by the government of Karnataka.
Extent of land : Total of 73 acres (3.18 million sft of land) For commercial development
Commercial : workspace for the IT companies in a Campus type of Environment
Built up potential of land : Approximately 7 million sft of office space
Ownership : 73 acres as joint development
Status : SEZ dedicated to IT/ITES industry

Pre Committed Campus :
Accenture
Details:
Massing: 2B+ 9 Levels of office space
Development size (sft): 1.7 Mn sft
Status: Under Construction
Huawei
Details:
Massing: 2B+ 9 Levels of office space
Development Size (Sft) : 1.05 Mn sft
Status: Under Construction

Location Map
Site Map

Available Blocks :
Block C1 (SEZ)
Total Built up area: 650,000 Sft
Building configuration: 2B+G+11 levels of office space
Floor plan: 50,000 Sft
Handover for fitout: July 2008
Building completion: October 2008
Power: 1.1 kva for every 100 sft of office Space leased. Car parking ratio – 1 car Park for every 750 sft of office space leased
Ground Floor Plan
Block B1 (SEZ)
Total Built up area: 650,000 Sft
Building configuration: 2B+G+11 levels of office space
Floor plan: 50,000 Sft
Handover for fitout: December 2008
Building completion: March 2009
Power: 1.1 kva for every 100 sft of office Space leased. Car parking ratio – 1 car Park for every 750 sft of office space leased
Ground Floor Plan

Built to suit options :
Technopark (SEZ) – C2
Location: Whitefield
Massing: 2B+G+11 levels
Development size (sq.fet.): 650,000
Technopark (SEZ) – C3
Location: Whitefield
Massing: 2B+G+11 levels
Development size (sq.fet.): 650,000
Technopark (SEZ) – B2
Location: Whitefield
Massing: 2B+G+11 levels
Development size (sq.fet.): 650,000

Technopark.pdf - PDF file for download
|